Viewpoint Logo
Line
Building a mine: From planning and power to machines and support

Building a mine: From planning and power to machines and support

When Stornoway’s Renard diamond mine began its production ramp-up in July 2016, it was ahead of schedule and under budget.

 » Read more

ISSUE 3: Power — a driving force at Drummond’s Mina Pribbenow

The bigger the mine, the harder it is to supply enough power to operate — especially in remote regions. Just ask Drummond Ltd. The company’s Mina Pribbenow open-pit coal operation in Colombia’s Cesar Coal basin has no access to commercial electric power. So they turned to Caterpillar, and together the two companies devised a 21-generator solution that helped power Mina Pribbenow’s increasingly productive operation.

 » Read more
Line
TRANSLATED CONTENT AVAILABLE:
English / Español / FranÇais / 中文 / PORTUGUÊS / РУССКИЙ
Line
Follow Caterpillar
Global Mining
LinkedInFacebookTwitter
@catmining
Line
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of Viewpoint.
Privacy Policy